国产成人综合色在线观看网站-蜜臀视频在线一区二区三区-亚洲精品无码国产-国产亚洲日韩欧美另类第八页-欧美熟妇精品一区二区三区

Information

The surface process of the waste water for the wastewater

1. Polishing the wastewater. During the process of the polishing on the parts, there will be abrasive materials and brightener existing in the waste water. The main pollutants are COD,BOD and SS. Refer to the following process procedures for treatment:
Wastewater → regulating tank→ coagu-flocculation reaction tank→ sediment tank→ hydrolysis acidification pool→ aerobiotic tank →secondary sedimentation tank→ filter →discharge

2. Remove oil and grease from the wastewater: The normal grease removal processes are: organic solvent degreasing, chemical degreasing, electrochemical degreasing, and ultrasonic wave degreasing. In addition to the organic solvent degreasing, other processes will contain degreasant such as alkaline matter, surface active agent and corrosion inhibitor, which will produce pollutants including pH, SS, COD, BOD, petroleum and chromaticity. Refer to the following steps to process:
Wastewater→ oil separator tank→ regulating tank →air-floatation equipment →anaerobic hydrolysis acidification →aerobicbiotreatment → sediment →filtration and adsorption →Discharge  
This type of the wastewater normally contains emulsified oil. Add demulsifier of CaCl2 before air floatation to break the emulsified oil. If the COD concentration in the waste water is too high, anaerobic method can be selected. If it is not too high, choose aerobic biotreatment for the process.
 
3. Pickling waste water. Pickling waste water is often used in the acid pickling process for the steel parts. The PH value of the waste water is 2-3, with high concentration of Fe2+ and SS. Refer to the following procedures for the treatment: wastewater→regulating tank→neutralizing tank→aeration oxidation pool→coagu-flocculation reaction tank→sediment tank→filter tank→pH value readjust tank→discharge  The phosphating wastewater can also called membranadermalis wastewater, which means that iron parts will produce a layer of phosphateprotective film on its surface as the painting coatings after being chemical processed in the solutions of manganese, iron and zinc to prevent rust. The major pollutants in this kind of wastewater is : pH,SS,PO43-,COD, and Zn2+. Refer to the following steps for the process: wastewater→regulating tank→primary coagu-flocculation reaction tank→sediment tank→ secondary coagu-flocculation reaction tank→secondary sedimentation tank→filter tank→discharge
 
4. The anodic oxidation wastewater for the aluminum. The main pollutants for this kind of the wastewater is pH,COD,PO43- and SS. Apply the phosphating wastewater process tfor the anodic oxidation wastewater.

主站蜘蛛池模板: 精品深夜av无码一区二区| 成在线人视频免费视频| 无码国产69精品久久久久同性| 国产在线亚州精品内射| 色婷婷国产精品高潮呻吟av久久| 久久精品视频在线看| 色一情一乱一伦| 国产精品久久久久不卡无毒| 一区一区三区产品乱码| 毛片免费视频在线观看| 亚洲综合网国产精品一区| 情人伊人久久综合亚洲| 人与人性恔配视频免费| 国产精品中文久久久久久久| 国产日韩综合av在线观看一区| 成av免费大片黄在线观看| 亚洲人成无码网站在线观看野花 | 丁香五月激情缘综合区| 韩国主播av福利一区二区| 亚洲aⅴ无码专区在线观看q| 精品黑人一区二区三区| 日本丰满大乳人妻无码苍井空| 无码中文字幕| 老头把我添高潮了a片| 永久免费无码av网站在线观看| 国产九九九九九九九a片| 亚洲综合性av私人影院| 国产九九久久99精品影院| 国产av新搬来的白领女邻居 | 波多野结衣中文字幕久久| av色欲无码人妻中文字幕| 午夜成人理论无码电影在线播放| 日本久久久久亚洲中字幕| 国产精品亚洲专区无码蜜芽| 国产精品人成在线播放新网站| 久久久久成人精品免费播放动漫| 人妻少妇乱子伦无码视频专区| 美女极度色诱视频国产免费| 日本无码欧美一区精品久久| 亚洲电影区图片区小说区| 强奷乱码中文字幕熟女一|