国产成人综合色在线观看网站-蜜臀视频在线一区二区三区-亚洲精品无码国产-国产亚洲日韩欧美另类第八页-欧美熟妇精品一区二区三区

Information

The surface process of the waste water for the wastewater

1. Polishing the wastewater. During the process of the polishing on the parts, there will be abrasive materials and brightener existing in the waste water. The main pollutants are COD,BOD and SS. Refer to the following process procedures for treatment:
Wastewater → regulating tank→ coagu-flocculation reaction tank→ sediment tank→ hydrolysis acidification pool→ aerobiotic tank →secondary sedimentation tank→ filter →discharge

2. Remove oil and grease from the wastewater: The normal grease removal processes are: organic solvent degreasing, chemical degreasing, electrochemical degreasing, and ultrasonic wave degreasing. In addition to the organic solvent degreasing, other processes will contain degreasant such as alkaline matter, surface active agent and corrosion inhibitor, which will produce pollutants including pH, SS, COD, BOD, petroleum and chromaticity. Refer to the following steps to process:
Wastewater→ oil separator tank→ regulating tank →air-floatation equipment →anaerobic hydrolysis acidification →aerobicbiotreatment → sediment →filtration and adsorption →Discharge  
This type of the wastewater normally contains emulsified oil. Add demulsifier of CaCl2 before air floatation to break the emulsified oil. If the COD concentration in the waste water is too high, anaerobic method can be selected. If it is not too high, choose aerobic biotreatment for the process.
 
3. Pickling waste water. Pickling waste water is often used in the acid pickling process for the steel parts. The PH value of the waste water is 2-3, with high concentration of Fe2+ and SS. Refer to the following procedures for the treatment: wastewater→regulating tank→neutralizing tank→aeration oxidation pool→coagu-flocculation reaction tank→sediment tank→filter tank→pH value readjust tank→discharge  The phosphating wastewater can also called membranadermalis wastewater, which means that iron parts will produce a layer of phosphateprotective film on its surface as the painting coatings after being chemical processed in the solutions of manganese, iron and zinc to prevent rust. The major pollutants in this kind of wastewater is : pH,SS,PO43-,COD, and Zn2+. Refer to the following steps for the process: wastewater→regulating tank→primary coagu-flocculation reaction tank→sediment tank→ secondary coagu-flocculation reaction tank→secondary sedimentation tank→filter tank→discharge
 
4. The anodic oxidation wastewater for the aluminum. The main pollutants for this kind of the wastewater is pH,COD,PO43- and SS. Apply the phosphating wastewater process tfor the anodic oxidation wastewater.

主站蜘蛛池模板: 亚洲人成网线在线播放va蜜芽| 2021精品国产自在现线看| 伊伊综合在线视频无码| 男人和女人做爽爽免费视频| 亚洲日韩精品欧美一区二区一| 久久熟妇人妻午夜寂寞影院| 亚洲精品国产品国语在线观看| 2017亚洲天堂最新地址| 成人无码α片在线观看不卡| 国产精品无码久久久久久久久久| 一本久道久久综合狠狠爱| 国产熟女一区二区三区四区五区| 自慰无码一区二区三区| 无码加勒比一区二区三区四区| 人禽伦免费交视频播放| 无码精品a∨在线观看十八禁软件| √天堂资源地址在线官网| 久久久久久精品色费色费s| 亚洲曰韩欧美在线看片| 无罩大乳的熟妇正在播放| 成·人免费午夜视频香蕉| 欧美与黑人午夜性猛交久久久| 永久黄网站免费视频性色| 久久精品国产色蜜蜜麻豆| 丁香色欲久久久久久综合网 | 国产成人精品无码片区| 国产久9视频这里只有精品| 文中字幕一区二区三区视频播放| 麻豆视传媒精品av| 日本丰满老妇bbb| 美女网站免费观看视频| 久久久久久毛片免费播放| 日韩成人免费无码不卡视频| 粗大黑人巨精大战欧美成人| 亚洲欧洲精品无码av| 国产午夜福利精品久久不卡| 精品国产乱码久久久久久口爆网站 | 日日噜噜噜夜夜爽爽狠狠| 中文字幕亚洲无线码一区女同| 97se狠狠狠狠狼亚洲综合网| 国产成人精品日本亚洲999|